top of page
![](https://static.wixstatic.com/media/1a7977_ec15e85b9cd747fca0e77feed887a01d~mv2.jpg/v1/fill/w_281,h_187,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/1a7977_ec15e85b9cd747fca0e77feed887a01d~mv2.jpg)
Portfolio
ALA Multi Purpose Building
OWNER:
American Leadership Academy
PROJECT SIZE:
22,950 sf
ARCHITECT:
Ken Harris Architects
LOCATION:
Spanish Fork, UT
USE:
Educational
Description:
The American Leadership Academy Multi Purpose building was constructed on the West side of their campus in Spanish Fork. The structure was built on slab-on-concrete, structural metal framing and trusses, metal roof, CMU exterior wainscoting, and metal siding. The building has a kitchen for culinary classes, band room, dance studio, theater room for practicing and rehearsing upcoming shows, and a gym to hold basket ball practices and games.
bottom of page